Precautions for the Construction for Geocell

As a geocell supplier, I will introduce geocell to u. Geocell is widely used on load support project,land stabilization project,slope and shoreline protection project and the river channel protection project. LYUAN geocell is honeycombed three-dimensional grid structure which is welded by high-strength HDPE sheet. The LUYUAN geocell is easy to stretch. It can be folded up when transport and opened to fill the earth or concrete when use it.


Geocell for Land Stabilization

1137027496.jpg

The Construction Slope Should Be Flat

The flatness of slope surface is related to the success or failure of geocell grass protection. When laying geocell when the slope surface is uneven, it is easy to produce stress concentration, make the grid welding point cracking, and cause the grid across the step. Therefore, level the slope surface to the design requirements, and use manual slope repair, slope surface pumice, dangerous rocks, etc..

In addition, the slope surface should be leveled. Dispose of some debris that are not conducive to the laying of the lattice chamber, so that the slope surface is kept flat and solid. You can also sprinkle a layer of soil first to facilitate the growth of plants.

 

Laying of Geocell

Fully open the geocell assembly and nail a hook-shaped rivet stake into each cell at the top, requiring the length of the rivet stake to be two times the length of the cell itself plus 30cm.

After the geocell is opened and riveted tightly, the space of the cell is filled from top to bottom with soil suitable for planting turf or grass seed, and patted firmly, and planted with vegetation in time.

In addition, the geocell should be laid from top to bottom in the main force direction, so that the cell sheet is heavily perpendicular to the highway roadbed.

 

Laying of Drainage Ditch

The side slope of geocell should be equipped with main drainage ditch system. Keep a distance of 4m between two adjacent drainage ditches; and the drainage ditch should be connected with the highway side ditch, so that the road surface water flows into the drainage channel along the side ditch into the highway edge, in order to prevent the geocell slope from being washed away when the road surface water.

When the geocell is used in the slope under the highway, the drainage ditch should be connected with the shoulder ditch to facilitate the drainage of water on the road.

When the geocell is used on the slope of the highway, it should set up a water blocking ditch on the top line of the upper slope, so that the water at the upper slope can flow into the drainage ditch and avoid the water from washing the slope directly.

评论

此博客中的热门博文

What Is a Dimpled Drainage Matting?

What Is a Dimpled Drainage Matting? Most  dimpled drainage matting  consist of a polypropylene or high-density polyethylene  sheet, molded into a series of raised knobs, or dimples. Polyethylene dimpled drainage mat helps water flow away from the foundation. Without it, water can stay trapped against the concrete or pool at the bottom. Drainage mats come with a dimpled design that lets water accumulate and flow away, creating an air gap. When a dimple mat is placed against a concrete wall, the dimples make the plastic stand out from the wall, leaving a free-draining air space between the plastic and the concrete. If any water reaches this air space, it easily flows to the bottom of the dimple mat. As water flows, it picks up small particles of silt and soil. When water stops moving—like when it reaches a concrete wall—silt and soil will accumulate, further increasing the pressure against the foundation. A drainage ma's membrane protects the mat from sediment clogging...

What are the Engineering Applications of Geocells?

  As a   Geocell Manufacturer , share with you. Geocell for Load Support 1. Deal with half-filled and half-cut subgrade When building an embankment on a slope where the natural slope of the ground is steeper than 1:5, the embankment base should be dug steps, and the width of the steps should not be less than 1M. When the road is built or rebuilt in phases and the road is widened, the junction of the new and old subgrade fill slopes should be opened. For digging steps, the width of the high-grade highway steps is generally 2M, and the geocell is laid on the horizontal surface of each step, and the geocell’s own elevation confinement reinforcement effect is used to better solve the problem of uneven settlement. 2. Roadbed in sandy areas Low embankments should be the main roadbed in sandy areas, and the filling height is generally not less than 0.3M. Due to the professional requirements for low roadbeds and heavy loads in sandy areas, the use of geocells can limit loose fillers. ...

What are the Precautions For Geogrid Transportation And Storage?

As a   Geocell Supplier , share with you. Geogrid is a material often seen in various building constructions, and its demand is still very large. How to store and transport the purchased materials is also a problem that customers care about. Geocell for Load Support 1. Storage of geogrid. Geogrid is a geosynthetic material produced from unique construction materials such as polypropylene and polyethylene. It has the disadvantage of being easy to age when exposed to ultraviolet light. Therefore, steel-plastic geogrid reinforced grids should be stacked in a room with natural ventilation and light isolation; The total time for the accumulation of the reinforcement is not more than 3 months. If the accumulation time is too long, it needs to be inspected again; when paving, attention should be paid to reduce the time of direct exposure to natural light to avoid aging. 2. Engineering construction of reinforcement. In order to prevent Geshan from being damaged at the construction site, a ...