Construction method:

 

Do not drag or pull the geomembrane during transportation to avoid injury from sharp objects.

1. Extend from the bottom to the high position, don't pull it too tightly, and leave a margin of 1.50% to prepare for local sinking and stretching. Taking into account the actual situation of this project, the slope shall be laid from top to bottom;

2. The longitudinal joints of two adjacent panels should not be on the same horizontal line, and should be staggered by more than 1m;

3. Longitudinal joints should be more than 1.50m away from the dam foot and bend foot, and should be located on a plane;

4. Slope first and bottom of the field;

5. When laying on a slope, the film spreading direction should be basically parallel to the line of maximum slope.

Layout:

1. Before laying the geomembrane, the corresponding qualified acceptance certificate of the civil engineering should be obtained.

2. Before cutting the geomembrane, the relevant dimensions should be accurately measured and then cut according to the actual size. Generally, it is not advisable to cut according to the size shown in the figure. It should be numbered piece by piece and recorded in detail on the special form.

3. When laying geomembrane, we should try to minimize the number of welds, and save raw materials as much as possible under the premise of ensuring quality. At the same time

Easy to ensure quality.

4. The lap width of the seam between the film and the film is generally not less than 10cm, usually the welding seam arrangement direction is parallel to the maximum slope, that is, arranged along the slope direction.

5. Usually in corners and deformed areas, the length of the joints should be as short as possible. Except for special requirements, on slopes with a slope greater than 1:6, within 1.5 meters from the top slope or stress concentration area, there should be no welds as far as possible.

6. When laying the geomembrane, avoid artificial wrinkles. When the temperature is low, it should be tightened and flattened as much as possible.

7. After the geomembrane is laid, it is necessary to minimize walking and moving tools on the surface of the membrane. Anything that can cause harm to the impermeable membrane should not be placed on the membrane or carried on the membrane to avoid damage to the membrane. Cause accidental damage.


What Methods should be Paid Attention to During the Construction of Geomembrane

评论

此博客中的热门博文

What Is a Dimpled Drainage Matting?

What Is a Dimpled Drainage Matting? Most  dimpled drainage matting  consist of a polypropylene or high-density polyethylene  sheet, molded into a series of raised knobs, or dimples. Polyethylene dimpled drainage mat helps water flow away from the foundation. Without it, water can stay trapped against the concrete or pool at the bottom. Drainage mats come with a dimpled design that lets water accumulate and flow away, creating an air gap. When a dimple mat is placed against a concrete wall, the dimples make the plastic stand out from the wall, leaving a free-draining air space between the plastic and the concrete. If any water reaches this air space, it easily flows to the bottom of the dimple mat. As water flows, it picks up small particles of silt and soil. When water stops moving—like when it reaches a concrete wall—silt and soil will accumulate, further increasing the pressure against the foundation. A drainage ma's membrane protects the mat from sediment clogging...

What are the Engineering Applications of Geocells?

  As a   Geocell Manufacturer , share with you. Geocell for Load Support 1. Deal with half-filled and half-cut subgrade When building an embankment on a slope where the natural slope of the ground is steeper than 1:5, the embankment base should be dug steps, and the width of the steps should not be less than 1M. When the road is built or rebuilt in phases and the road is widened, the junction of the new and old subgrade fill slopes should be opened. For digging steps, the width of the high-grade highway steps is generally 2M, and the geocell is laid on the horizontal surface of each step, and the geocell’s own elevation confinement reinforcement effect is used to better solve the problem of uneven settlement. 2. Roadbed in sandy areas Low embankments should be the main roadbed in sandy areas, and the filling height is generally not less than 0.3M. Due to the professional requirements for low roadbeds and heavy loads in sandy areas, the use of geocells can limit loose fillers. ...

What are the Precautions For Geogrid Transportation And Storage?

As a   Geocell Supplier , share with you. Geogrid is a material often seen in various building constructions, and its demand is still very large. How to store and transport the purchased materials is also a problem that customers care about. Geocell for Load Support 1. Storage of geogrid. Geogrid is a geosynthetic material produced from unique construction materials such as polypropylene and polyethylene. It has the disadvantage of being easy to age when exposed to ultraviolet light. Therefore, steel-plastic geogrid reinforced grids should be stacked in a room with natural ventilation and light isolation; The total time for the accumulation of the reinforcement is not more than 3 months. If the accumulation time is too long, it needs to be inspected again; when paving, attention should be paid to reduce the time of direct exposure to natural light to avoid aging. 2. Engineering construction of reinforcement. In order to prevent Geshan from being damaged at the construction site, a ...